Sign in
LRFR · Lesson 17

Concrete box culverts

A culvert carries its traffic through soil. The fill spreads the wheels and takes away the impact, but it also adds its own weight and pushes on the walls. Rating the top slab is mostly about how those soil loads trade off against the truck.

Key points

RF = C − γDCDC − γDWDW ± γEVEV ± γEHEH ± γESESγLL(LL + IM) + γLSLS
  • The box is a frame. A 1-ft slice is analysed as a closed frame with gross sections and a uniform soil reaction under the bottom slab. Each member carries moment, shear and thrust; the lowest RF of all sections controls.
  • Soil loads can help or hurt. Sideways earth pressure bends the corners and relieves the top slab's midspan moment. So each soil load takes its maximum factor where it adds to the truck effect and its minimum where it helps.
  • The fill spreads the wheels. From 2 ft of fill down, each tire patch spreads 1.15 ft per ft of depth and neighbouring patches merge. Under 2 ft, the axle goes on a slab strip instead. Impact falls to zero at 8 ft of cover.
  • Culverts use their own load factors. Strength I for design and legal loads, Strength II for permits, no service check. The legal load factor is 2.00, not the ADTT-based 1.30–1.45 used for bridges.
  • Deep fill is about the soil. Past about 8 ft the truck is a small part of the demand, and the rating depends on the soil weight and the earth load factors.
In Virginia

Re-rate a culvert when its condition rating drops to 4 (Poor) or below; if a condition factor is used, it is 0.90 for Poor. BrR is the default program, with CANDE or LARSA 4D for buried structures that BrR cannot rate. VDOT's BrR culvert settings include the bottom slab and do not ignore live load under deep fill, so the truck stays in the rating even where LRFD would let you drop it. VDOT IIM-S&B-86.5 §4.2, §11.1 · VDOT-LR-G3 p.1 · VDOT-LR-G6 pp.23, 26

Quick check

The fill over Example 1 is raised from 3 ft to 6 ft. What happens to the impact allowance?

An engineer uses a smaller earth pressure coefficient k "to be safe" when rating the top slab at midspan. Is it safe?

The same culvert is rated for the AASHTO Type 3 at the legal level instead of at design operating. Compared with a bridge, what is unusual?

Sources

A study aid, not a substitute for the AASHTO MBE or an agency's rating procedures. Example numbers are illustrative.