Posting and permit policy
The MBE says when a bridge must be posted. Who decides, which sign goes up, how fast, and how the permit office finds out are state decisions. This sheet follows Virginia's rules from the rating results to the sign.
Key points
- The federal rule is the floor. Post when the legal loads or the state's routine permit loads exceed what the rating allows, within 30 days. Fix a missing or unreadable sign within 30 days. Close a bridge that cannot carry 3 tons.
- The MBE leaves the rest to the owner. The posted values, the sign types, the decision process, the permit vehicles and permit procedures all differ from state to state.
- The rating is the ceiling for the sign. An owner may post lower than the rating supports, never higher.
- Engineers recommend, the owner decides. The decision weighs condition, visible distress, redundancy and traffic, not just the number.
- The posting has to reach the haulers. A sign on the road is half the job. The permit office and the trucking industry need the restriction in their systems too.
Hauling permits are issued by DMV. VDOT's weight restrictions, entered in DBIR by S&B staff, reach DMV's EZ-Haul and the trucking industry through the TruckWeb map, rebuilt each weekday night. Emergency vehicles may cross a posted VDOT structure only with a 12-month authorization, based on a PE-sealed rating, under Code §46.2-1130.1; that IIM dates from 2007 and predates EV2 and EV3, so confirm it still governs. The workbook's BP-90 and BP-115 blanket permit vehicles are not in the current IIM-86.5 or G2. VDOT IIM-S&B-35.9 pp.1–3 VDOT IIM-S&B-75 pp.2–6 VDOT IIM-S&B-86.5 §7.3
Quick check
A rating finished on 2 March shows a bridge needs posting. The district wants a load test first. When must the sign be up?
The 30 days run from the rating that shows the need. A temporary sign is allowed while testing or analysis goes on, but it does not stop the clock.
Legal trucks need a 12-ton limit and the EVs a 30-ton limit. What sign does VDOT's guidance point to?
When both are needed and the limits differ a lot, co-post (R12-VP2 gross or R12-VP3 truck load). When they are close, one legal-load sign can cover both. Example 3 on the sheet.
In Example 1, tick the load test line under Given. What may the district do?
When a load test supports RF ≥ 1 but the analysis does not, G4 lets the district evaluate posting at the legal weight limits.
Sources
- FHWA-NHI 130092, LRFR participant workbook, Lesson 12 (pp. 393–420), with VDOT's 2018 IIM as its example.
- 23 CFR 650.313(k)–(m) (rating, posting within 30 days, signs, closure below 3 tons).
- AASHTO MBE 3rd Ed., 6A.8 (posting), 6A.4.5 (permits). The MBE is in a protected copy that cannot be searched.
- VDOT IIM-S&B-86.5 (June 2025), §7 and §7.3 (vehicles), §9 (insufficient information), §13 (closure).
- VDOT load rating guideline G4 pp.1–7 (posting decision, signs Tables 1–2, workflow, closure); G2 p.1; G5 pp.1–2.
- VDOT IIM-S&B-35.9 (TruckWeb, DBIR, EZ-Haul); IIM-S&B-75 (emergency vehicles over posted structures).
- Not in the library: DMV's permit rules and fees, EZ-Haul's routing logic, the current blanket permit vehicles, the text of Code of Virginia §46.2-1129 ff., and the sign drawings.
A study aid, not a substitute for the NBIS, the AASHTO MBE or VDOT's posting procedures. The cases are illustrative, and the owner makes the final decision.