A rating truck loads a lane, but a girder rating needs the share of that lane one girder takes. That share is the distribution factor. It sits under the truck in the rating factor, so a 10% error here is a 10% error in the rating.

Key points

gm2 = 0.075 + S9.50.6 SL0.2 Kg12L ts³0.1
  • The factor is in lanes. It is the share of one loaded lane that one girder carries. The old S/D factors were in wheels: divide them by 2 before comparing.
  • Never apply m to the formulas. The 1.2 for one lane is already inside gm1 and gv1. Apply m (1.2, 1.0, 0.85, 0.65 for 1, 2, 3, more lanes) only to the lever rule, the rigid section check and refined analysis. For one fatigue truck, divide the 1.2 out.
  • Moment depends on spacing, span and stiffness; shear on spacing only. Compared with S/5.5, LRFD usually gives less moment and more shear, so shear can govern ratings it never governed before.
  • The exterior girder takes the worst of three. The lever rule for one lane, the corrected interior factor for two or more, and, with cross-frames, the rigid cross-section check.
  • Skew helps moment and hurts end shear. Moment may be reduced above 30°; support shear at the obtuse corner goes up from the first degree. Outside the formulas' range, use the lever rule or a refined analysis.
In Virginia

For BrR girder-system models, leave the distribution factors blank so BrR computes them; enter them only from a load test or a refined analysis. Inverted T-beams are not an LRFD beam-slab type: VDOT uses the slab equivalent strip equations for them. VDOT-LR-G6 p.2 VDOT-MOSB-P2-C12 p.77

Quick check

Girder spacing doubles from 6 ft to 12 ft. The interior shear factor for two lanes…

The one-lane moment formula gives gm1 = 0.48. What factor do you use for the single fatigue truck?

Load Example 1 and raise de from 1.5 ft to 3 ft (a wider overhang). Which exterior moment factor rises the most?

Sources

A study aid, not a substitute for the AASHTO LRFD specifications, the MBE or an agency's rating procedures. Beam-slab bridges with concrete decks (LRFD cross-sections a, e, k) only. Example numbers are illustrative.