Why bridges are load rated

A load rating says how much truck a bridge can carry as it stands today. The bridge, its dead load and the trucks all change over the years, so a rating that was right once goes out of date.

Does this bridge need a new rating?

Tick what has happened to the bridge. The sheet says whether a new rating is due, who decides, and the deadline.

Key points

RF = capacity − dead loadlive load
  • A rating is for a named vehicle. The answer is a rating factor (or tons) for that vehicle. RF ≥ 1 means the bridge carries it. Lesson 3 adds the load and resistance factors.
  • All three terms drift. Capacity goes down with corrosion and damage. Dead load goes up with overlays and new barriers. Trucks get heavier, and new vehicles are added. Any one of them can push a passing bridge below 1.
  • Dead load comes off first. A 10% loss of capacity costs more than 10% of the rating, because the dead load does not shrink with the member.
  • Re-rate when something changes. A new bridge, a change in dead load, damage or repair to a member, heavier loading, or new rating rules. Federal rule: within 3 months; post within 30 days when a rating shows the need; close below 3 tons.
  • Rate until the governing member is found. All primary superstructure members, for moment, shear and axial force. Check the substructure, decks and connections where they could govern; truss gusset plates are now rated after the I-35W collapse.
In Virginia

IIM-S&B-86.5 (June 2025) adds re-rating triggers: a GCR of 4 or below for the superstructure, substructure or culvert, a condition change the BSIE judges important, and temporary jacking or blocking under traffic. The 3-month deadline applies; if the District cannot meet it, it reports to the Load Rating Program Manager. LRFR is required for bridges designed or rehabilitated under LRFD; other methods need a written reason. VDOT IIM-S&B-86.5 §4–§6

Quick check

A girder rates RF = 1.20, and its dead load uses half of its capacity. It loses 10% of its capacity. The rating becomes about…

Nothing on a bridge has changed, but a heavier truck is now allowed on the route. Does the bridge need a new rating?

In the first sheet, load Example 3 and set today's live load back to the old value. What is the rating today?

Sources

A study aid, not a substitute for the AASHTO MBE, the NBIS or an agency's rating procedures. Example numbers are illustrative.